Top Off-Grid Electric Cooperatives with Lowest Residential Rates for September 2024 | October 30 ,2024
Tielco Elecdu
/ November 11, 2024
๐ฃ๐๐๐๐ฅ๐๐๐๐ฎ๐น๐ฎ๐บ๐ฎ๐ปย Here are the Top off-grid Electric Cooperatives that offered lowest residential rates for the month of SEPTEMBER 2024: 1….
Read More
Day 3 of Restoration: TIELCO Linemen Continue Repairs in Typhoon Kristine-Affected Areas | October 24, 2024
Tielco Elecdu
/ November 11, 2024
The personnel of TIELCO are continuously conducting widespread restoration and repairs in areas that were damaged and lost power service….
Read More
Unwavering Dedication: TIELCO Team Prioritizes Power Restoration Amid Typhoon Kristine’s Challenges | October 24, 2024
Tielco Elecdu
/ November 11, 2024
๐๐๐๐๐๐ ๐๐๐๐๐๐ Despite the challenges brought by #๐๐ฒ๐ฉ๐ก๐จ๐จ๐ง๐๐ซ๐ข๐ฌ๐ญ๐ข๐ง๐, including heavy rains, strong winds, and hazardous conditions, the dedicated employees of…
Read More
Unwavering Dedication: TIELCO Team Prioritizes Power Restoration Amid Typhoon Kristine’s Challenges | October 24, 2024
Tielco Elecdu
/ November 11, 2024
Resilience in Action: TIELCO Linemen Work Tirelessly to Restore Power After Typhoon Kristineโs Devastation | October 23, 2024
Tielco Elecdu
/ November 11, 2024
Here are some powerful images capturing the tireless efforts of linemen working to restore power after the massive destruction caused…
Read More
{"dots":"true","arrows":"true","autoplay":"true","autoplay_interval":3000,"speed":"1000","loop":"true","design":"design-2"}
SITIO BATACAN IS NOW ENERGIZED | AUGUST 05, 2024
Tielco Elecdu
/ September 5, 2024
On August 4, 2024, a significant milestone was achieved in Sitio Batacan, located in Brgy. Pinamihagan, San Jose, as the community was energized. This initiative directly benefited fourteen (14) households,…
Read More
Honoring our brave and dedicated line workers the “Warriors of Light” | August 5, 2024
Tielco Elecdu
/ September 5, 2024
We joined the nation in honoring our brave and dedicated line workers the "Warriors of Light" together with the National Electrification Administration (NEA) and the Philippine Rural Electric Cooperatives Association(PHILRECA)….
Read More
NEA & EC SIMULTANEOUS ANNIVERSARY KICK-OFF CELEBRATION | AUGUST 2, 2024
Tielco Elecdu
/ August 5, 2024
In celebration of the 55th Founding Anniversary of the National Electrification Administration (NEA) and the 15th National Electrification Administration Awareness Month (NEAM), TIELCO employees, under the leadership of General Manager…
Read More
NOTICE: Unauthorized Use of TIELCO Poles for Internet/CCTV Cables – Removal in 15 Days Without Pole Use Contracts | July 31, 2024
Tielco Elecdu
/ August 5, 2024
PABATID SA LAHAT NA KINAUUKULAN: Ayon sa ginawang pag-iikot ng mga teknikal na mga kawani ng TIELCO, atin pong nalaman na madaming indibidual ang naglagay o gumamit ng mga poste…
Read More
๐๐๐๐๐๐ ๐๐๐๐๐ ๐ข๐ฌ ๐ง๐จ๐ฐ ๐๐๐๐๐๐๐๐๐ ๐ข๐ง ๐๐๐๐
Tielco Elecdu
/ August 5, 2024
๐๐ญ๐๐ฉ๐ฌ ๐จ๐ง ๐ก๐จ๐ฐ ๐ญ๐จ ๐ฉ๐๐ฒ ๐ฒ๐จ๐ฎ๐ซ ๐๐๐๐๐๐ ๐๐ฅ๐๐๐ญ๐ซ๐ข๐ ๐๐ข๐ฅ๐ฅ๐ฌ ๐ฏ๐ข๐ ๐๐๐ฒ๐ ๐๐ญ๐๐ฉ #๐ ๐๐๐๐ ๐ฆ๐๐ข๐ โ๐ด๐จ๐๐จโ ๐๐๐๐๐๐๐๐ก๐๐๐ ๐๐๐ ๐๐๐๐๐๐๐ ๐ก๐ โ๐ฉ๐ฐ๐ณ๐ณ๐บโ. ๐๐๐๐ ๐ ๐ข๐๐ ๐ก๐ โ๐๐ฃ๐ ๐๐๐๐ข๐โ ๐๐๐๐๐๐๐ ๐๐ ๐ฆ๐๐ข๐ ๐๐๐๐๐ข๐๐ก…
Read More
LOOK: TIELCO’s “Warriors of Light” are once again mobilizing to extend their assistance beyond repairing damaged electrical wires. | July 26, 2024
Tielco Elecdu
/ July 26, 2024
LOOK: TIELCO's "Warriors of Light" are once again mobilizing to extend their assistance beyond repairing damaged electrical wires. In the wake of Typhoon Carina, which caused extensive damage to the…
Read More
LOOK: Attempt to repair and restore electric system going to Bgy. Marigondon Norte in San Andres was stalled due to unpassable road caused by a landslide. | July 25, 2024
Tielco Elecdu
/ July 26, 2024
LOOK: Attempt to repair and restore electric system going to Bgy. Marigondon Norte in San Andres was stalled due to unpassable road caused by a landslide. Situation also in…
Read More
LOOK: TIELCO was again given EXCELLENT Rating by the Department of Trade and Industry (DTI) for the successive semester based on its Suppliers Performance Evaluation | July 25, 2024
Tielco Elecdu
/ July 26, 2024
LOOK: TIELCO was again given EXCELLENT Rating by the Department of Trade and Industry (DTI) for the successive semester based on its Suppliers Performance Evaluation that is measured by the…
Read More
TINGNAN: Magkasunod na isinagawa ng TIELCO Construction Team sa pamumuno ni Foreman Richard Prudencio Tuquib ang pagpalit at pagsasaayos ng nabaling poste sa mga munisipyo parte ng Tablas | July 25, 2024
Tielco Elecdu
/ July 26, 2024
TINGNAN: Magkasunod na isinagawa ng TIELCO Construction Team sa pamumuno ni Foreman Richard Prudencio Tuquib ang pagpalit at pagsasaayos ng nabaling poste ng kuryente na sinira ng isang buhawi sa…
Read More
TINGNAN: Isang poste ng kuryente ang naputol at nabuwal kasama ang pagkasira ng ilang kabahayan at istraktura matapos itong madaanan ng isang malaking ipo ipo o buhawi sa Bgy. Agpudlos, Bayan ng San Andres | July 24, 2024
Tielco Elecdu
/ July 26, 2024
TINGNAN: Isang poste ng kuryente ang naputol at nabuwal kasama ang pagkasira ng ilang kabahayan at istraktura matapos itong madaanan ng isang malaking ipo ipo o buhawi sa Bgy. Agpudlos,…
Read More