LOOK: Attempt to repair and restore electric system going to Bgy. Marigondon Norte in San Andres was stalled due to unpassable road caused by a landslide. | July 25, 2024


LOOK: Attempt to repair and restore electric system going to Bgy. Marigondon Norte in San Andres was stalled due to unpassable road caused by a landslide.
 
Situation also in Sitio Timbaon, Danao Norte, Sta Fe shows a number of distribution lines hit by fallen coconut trees and big bamboo trunks. Technical personnel of TIELCO are doing their very best to complete the restoration process at 100% before the day ends.

Source: TIELCO FB PAGE