Skip to content

TIELCO

Electric Cooperative in Tablas Island

Menu
  • Homepage
  • News & Events
    • Power Advisory
    • Power Rates
    • Generation Rate
    • Electricity Rates
      • 2020
      • 2021
      • 2022
    • CSP
      • Invitation To Bid
      • Terms of Reference (TOR)
      • Notice of Awards – CSP
      • Supplemental/Bid Bulletin
  • Consumer Care
    • Downloadable Forms
      • Application For Membership
      • BAPA Clearance/Entrance
      • Membership ID Card
      • Right Of Way Consent
      • Initial Load Inventory
      • Contract of Service
    • Application For New Connection
  • About us
    • Gallery
    • Officials
    • Awards and Recognition
    • Milestone
  • Contact Us
  • Career

Day: June 11, 2021

Power Bloc Makes Strides in the Energy Sector before Adjournment of Session

June 11, 2021
| No Comments
| News & Events

In the midst of the COVID-19 pandemic, the Power Bloc Representatives composed of Presley De Jesus of PHILRECA Party-List, Sergio Dagooc of APEC Party-List, Adriano Ebcas of Ako Padayon Pilipino Party-List, and Godofredo Guya of RECOBODA Party-List remained vigilant to the prevailing issues confronting the energy sector especially to their constituents, the electric cooperatives and […]

Read More »

35 Indigent Beneficiaries received Pantawid ng Liwanag Program 3 cash allocation in Carabao Island

| No Comments
| News & Events

Thirty five (35) qualified indigent beneficiaries were selected to receive P3,000 cash assistance from the fund allocation of the Powerbloc Party list Congressmen of RECOBODA and APEC in Carabao Island, Romblon . The PANTAWID LIWANAG PROGRAM (Phase 3) electricity consumption subsidy was distributed to the selected indigent last Monday, June 7, 2021 by personnel of […]

Read More »

POWER INTERRUPTION UPDATE (June 10, 2021 7:52 pm)

| No Comments
| News & Events, Power Advisory

At 7:07 pm tonight a line fault was detected by recloser system putting off the entire Municipalities of Looc, Sta Fe and from Guinhiyaan Looc to Taboc, Alcantara. An attempt to restore electric supply at 7:13 pm, but the attempt was unsuccessful and fault current had been detected. After a number of minutes of line […]

Read More »

Replacement of Defective Transformer | Poblacion Alcantara

| No Comments
| News & Events

At almost 11:49 pm yesterday, with the able supervision of COMD Manager Fred Siscar, the Guinhiyaan Service Crew under Foreman Von Tirazona replaced a defective transformer at Pob. Alcantara. Earlier the defective transformer caused a transient fault between Guinhiyaan, Looc to Taboc Alcantara where the fault was caused by said malfunctioned distribution transformer. To remedy […]

Read More »

Upgrading of SMART Sawang, San Agustin Power Meter and Accessories | Tielco Main Metering Crew

| No Comments
| News & Events

An upgrade activity was just carried yesterday (June 10, 2021) at Sawang, San Agustin (Smart) by the Tielco Metering Crew initiated by Engr. Felix D. Panoy (Materials and Equipment Chief) and Jonicel E.Pablo  (Special Equipment Section Head).   The team was also accompanied by our Tielco technicians: Jaypee Tambalque, Dennis Galindez, Joseph R. Marquez, and […]

Read More »

June 2021
M T W T F S S
 123456
78910111213
14151617181920
21222324252627
282930  
« May   Jul »

Copyright © 2021-2025 TIELCO, Inc. | All Rights Reserved | Designed By Tielco I.T. Division | Privacy Policy | Disclaimer