As a result of the damage of the alternators of Units 3 and 5 of SUWECO in the last two days, the dependable capacity of their plant was reduced to only 6.5 MW while the current peak demand between 5:30 to 10 pm is at the average of 8 MW. Because of the shortfall in power supply, load dropping will be scheduled today on the following areas and its estimated time of power restoration: