As part of the mandated protocol to minimize the impact of calamities to the Electric Cooperatives distribution system and related facilities, and as directed by the National Electrification Administration to prepare Emergency Response Plan, TIELCO conducted a pre-typhoon planning conference involving technical personnel today to direct quick response actions and restoration protocols should any feeder system will be affected by typhoon “Auring“.
The plan includes the preparation of materials needed, vehicles and teams assigned to address specific areas within the franchise of TIELCO.