November 30, 2020 01:00 am to 02:00 am (SAN AGUSTIN)


POWER INTERRUPTION UPDATE: (11/30/2020)
A line fault occurred at 3:18 this afternoon causing the line tripping from Sta. Maria recloser to San Agustin poblacion. As a result of the immediate line tracing activity, a collapse coconut tree was found to be the cause of the line fault located at Barangay Lusong San Agustin. Power was restored to Bachawan at 3:58 P.M., Bachawan to San Agustin endline at 4:30 P.M.